Carpark in Amsterdam

Amsterdam - Netherlands

When renovation of the expansion joints and the floor and wall coatings in the centrally located P3 Mikado multi-storey car park was due in mid-2015, the clients, the Amsterdam maintenance management and engineering firm Intures BV, insisted on quick-acting systems in order to minimise downtime.
Fast, faster, MC-Floor TopSpeed
The initial situation was not ideal: a floor covering that was too slippery, water ingress through the expansion joints and an overall picture that left the client feeling rather insecure. However, MC offers particular expertise in this field, with its product systems having extensively proven themselves in the repair of multi-storey car parks and underground garages requiring a variety of different refurbishment solutions. Two injection resins from the MC-Injekt family were used to seal the expansion joints, and an MC surface protection system was employed for wall refurbishment and coating. For the repair of the floors, the client and planning engineers opted for the rapidity offered by the high-end MC-Floor TopSpeed pigmented roller-coating system. 
Following the surface preparation work, the substrate was coated with the transparent epoxy resin MC-DUR 177 WV-A, followed by two layers of anti-slip MC-Floor TopSpeed, a combination that ensures high abrasion resistance and outstanding scratch resistance.

The floor coating work in the P3 Mikado multi-storey car park in Amsterdam was completed in just five days.
The floor coating work in the P3 Mikado multi-storey car park in Amsterdam was completed in just five days.
© MC-Bauchemie 2024


Above all, MC-Floor TopSpeed offers fast application with accelerated curing, even under adverse weather conditions. As a result, all the coating work covering an area of 14,000 square metres was completed within just five days! It created one more satisfied customer who is now thoroughly convinced that floor refurbishment in an enclosed car park does not have to be unduly time-consuming or cost-intensive. And with a sparkling new floor, the facility was able to quickly return to generating revenue for its owners.

abs 123 abs 123 abs 123 abs 123 abs 123 abs 123 abs 123